Skip to main content
STATUS: PRE-CONSTRUCTION · SITE A UNDER EXCLUSIVITYNODE: VASILIKOS-01 — 34.7246°N, 33.2247°ECAMPUS: RISC-V PHASE 1 · MULTI-SILICON EVAL · PLANNEDPOWER: 42MW ON-SITE GENERATION · DESIGN TARGETSTATUS: PRE-CONSTRUCTION · SITE A UNDER EXCLUSIVITYNODE: VASILIKOS-01 — 34.7246°N, 33.2247°ECAMPUS: RISC-V PHASE 1 · MULTI-SILICON EVAL · PLANNEDPOWER: 42MW ON-SITE GENERATION · DESIGN TARGET
AGICY.AI
StackTechnology OverviewRISC-V sovereign stackComputeBare-metal EU compute
FacilitiesData CentersWorldwide map & trackerVasilikos Campus42MW sovereign campus briefingSustainability100% renewable mission
HardwareHardware FleetVendor hub · phased COD roadmapTenstorrent GalaxyPhase 1 Blackhole fleet (pre-COD)AESOLAR AlpineEnergy stack · hail-class PV + BESSAMD HeliosPhase 2 open rack-scale (eval · pre-COD)CerebrasPhase 2 · wafer-scale eval (pre-COD)
Submit your Hardware for reviewPropose accelerators for the Vasilikos fleet
AIAI Web SearchNew!Sovereign AI search · AGICY & the webAI My MapsNew!Smart Maps · voice routing · agentsAgents Trading CryptoBeta · New!Live paper-trading arena · BTC · ETH · SUIAI Video SearchNew!Find AI videos · avatars · films · adsAdvertiseSearch ad program · how it works · board ranks
GatewayCopperwayEU-sovereign OpenAI-compatible gatewayTry PlaygroundNewLive Copperway demo · PII vaultSovereign Exchange5-year cross-org sovereign plan
ProductsReserve CapacityPre-construction LOI tiersMarketplaceCompute marketplaceGPUs Rent LiveLiveEU partner GPU now · until CODCompute VouchersSovereign compute creditsModel LeaderboardFrontier model rankingsPricingSubscription tiers
WorkloadsComputeBare-metal EU inference & trainingCopperway GatewayOpenAI-compatible EU APIVasilikos Campus42MW sovereign campus briefing
Trust & complianceTrust CenterSecurity portal · docs · statusEU AI ActRegulatory mapping & controlsAI Readiness AuditPublic-data readiness hub
PricingTiers
Capital & EducationInvestInstitutional data room & deal flowAcademyAI training programs
Individuals & Family OfficesLiving in EUNewClass B capital allocation · no visa framingInternationalNewPlan B · equity alternative to property
IntelligenceResearchPublications & portals
CompanyAboutBrand · HoldCo targetMissionCharter & sovereigntyTrust CenterSecurity portal · docs · status
Schedule Briefing
Sign In
§ 00z17Overview§ 01ThesisNext to data§ 02ArchitectureTelum II§ 03Form factorsGA 12 Aug§ 04GalaxyCompare§ 05DiligenceCLOUD Act§ 06AGICYRelevance
Sheet 00 · Plan viewAGICY-IBMZ-001

Hardware · IBM z17 / LinuxONE 5 · Pre-COD

IBM z17

IBM z17: AI that lives where the data already is

Phase 2+ watchlist at AGICY Vasilikos — silicon optionality, not endorsement

IBM announced general availability of IBM z17 and LinuxONE 5 single-frame and rack-mountsystems on 12 August 2026. The job is not campus GPU training. It is inferencing beside core banking, payments, claims, and citizen records that cannot leave the datacenter. Phase 1 capital planning remains Tenstorrent Galaxy.

  • AI next to the ledger
  • Telum II on-chip accelerator
  • Spyre for larger genAI
  • Phase 2+ · on Watchlist
  • No IBM endorsement
  • Vendor figures under diligence
  • Not Phase 1 capital plan
  • Pre-COD · quote-only
Thesisvs GalaxyDiligenceResearch article
IBM z17 single-frame system — matte black four-module cabinet with blue LED accents, IBM product photographyIBM z17 single-frame · vendor photography · not AGICY inventory
GA12 Aug 2026 (IBM)
Telum IIOn-chip AI (IBM)
SpyreGenAI expand (IBM)
P2+Watchlist · not CapEx
Sheet 01 · ThesisAI next to the ledger

Move AI to the transaction

Public GPU farms win research and elastic training. Core payments cannot wait for a round trip to someone else's cluster.

Research disclaimerThroughput, inference-ops, and security figures marked IBM-stated or vendor-claimed require independent validation. IBM is evaluated as Phase 2+ optionality — not a strategic partner endorsing AGICY's financial model. No exclusive IBM supply contract is claimed. Campus pods are pre-COD plans, not live capacity.
Verified · GA date (IBM, 12 Aug 2026)Vendor · performance / inference ops

The architectural bet is simple: instead of shipping decades of regulated records to an external GPU environment, IBM z17 keeps inferencing on the same trusted platform that already posts the transaction. Telum II carries a second-generation on-chip AI accelerator; IBM Spyre expands capacity for larger generative workloads.VENDOR-CLAIMED

That is a different problem from Galaxy fleet economics or Cerebras wafer-scale training. Complementary — not a substitute.VERIFIED

Next: Architecture →

Sheet 02 · ArchitectureTelum II · Spyre

Telum II + Spyre on the platform

On-chip inferencing for transactional AI; Spyre for larger generative jobs — IBM's stated stack.

  • Telum II— IBM's processor generation with a second-generation on-chip AI accelerator, aimed at scoring transactions without a network hop to a GPU farmVENDOR-CLAIMED
  • IBM Spyre Accelerator — expansion path IBM describes for larger generative AI workloads that outgrow the on-chip unitVENDOR-CLAIMED
  • LinuxONE 5 — Linux-only sibling in the same family; same GA expansion (single-frame and rack-mount) as z17VENDOR-CLAIMED
  • IBM also positions Infrastructure Management for Z, plus a no-cost Cyber Security Posture Assessment across 30 domains and a z17 Security Advantage offer — sales packaging, not AGICY inventoryVENDOR-CLAIMED
IBM Telum II processor and IBM Spyre accelerator chips
Telum II + Spyre silicon · IBM / PR Newswire · vendor photography
IBM Spyre Accelerator on a PCIe card
Spyre PCIe card · IBM / PR Newswire · vendor photography

Deep dive: IBM z17 / LinuxONE 5 research article →

Next: Form factors →

Sheet 03 · Form factorsGA 12 Aug 2026

Smaller footprint, same class of trust

July expansion announced; 12 August 2026 IBM says single-frame and rack-mount systems are generally available.

IBM z17 rack-mount configuration in a white industry-standard rack with Z-branded drawers
z17 rack-mount · GA 12 Aug 2026 · IBM product photography
IBM LinuxONE 5 Rockhopper server cabinet with LinuxONE branding on an orange studio background
LinuxONE 5 Rockhopper · IBM product photography
Technician sliding a fan-cooled IBM Z drawer into a rack-mount IBM z17 system
Rack-mount lifestyle · IBM newsroom · not AGICY campus photography
Claim classStatus at AGICYNotes
z17 + LinuxONE 5 single-frame / rack-mount GAIBM-stated · 12 Aug 2026Not AGICY inventory; watchlist only
Up to 450 billion AI inference operations / dayIBM-stated · fraud-class workloadsDo not treat as an AGICY measured figure
Phase 1 CapEx / P&LGalaxy capital plan onlyIBM Z does not underwrite Round 1 fleet math

Next: z17 vs Galaxy — different problems →

Sheet 04 · Comparisonz17 vs Galaxy

z17 vs Galaxy — different problems

Galaxy is the Phase 1 fleet anchor. IBM Z is a regulated-transaction AI lane under evaluation.VERIFIED

IBM z17 / LinuxONE 5

  • AI inferencing beside core transactions — latency, compliance, data that cannot leave the hallVENDOR-CLAIMED
  • Phase 2+ watchlist — complementary, not a Galaxy substitute
  • US vendor; customer-owned iron in Cyprus is residency of the box, not CLOUD Act-proof IBM Cloud

Tenstorrent Galaxy

  • Modular open RISC-V servers for sovereign batch and civil inference at fleet scaleVENDOR-CLAIMED
  • Air-cooled Phase 1 capital / P&L baseline
  • Primary underwriting silicon (pre-COD)

Also on the queue: Cerebras CS-3 (wafer-scale), AMD Helios (open rack-scale), and d-Matrix Corsair (decode lane).

Next: Diligence & honesty →

Sheet 05 · DiligenceHonesty ledger

Diligence & honesty

What AGICY claims — and what it does not — about IBM Z on campus.

AGICY honesty checkPhase 1 capital, P&L, and fleet planning are anchored on Tenstorrent Galaxy. IBM z17 / LinuxONE 5 is Watchlist · Phase 2+. Do not read this page as installed IBM Z capacity, an IBM endorsement, a signed exclusive supply contract, or a CLOUD Act-proof IBM Cloud region in Cyprus.VERIFIED
  • IBM is a US vendor. Customer-owned hardware in an EU hall is residency of the box — not the same as EU-controlled firmware, keys, and support pathVERIFIED
  • IBM-operated cloud or remote support can re-introduce CLOUD Act exposure; that is a different diligence question from on-prem ironVERIFIED
  • IBM-stated 450 billion inference operations per day is not an AGICY measurementVENDOR-CLAIMED
  • watsonx Code Assistant for Z / watsonx Assistant for Z are IBM tooling claims for skills shortage — not AGICY productsVENDOR-CLAIMED

Next: AGICY relevance (pre-COD) →

Sheet 06 · DeploymentAGICY relevance

AGICY relevance

Multi-silicon sovereign posture (pre-COD) — transactional-AI optionality beside the Galaxy Phase 1 anchor.

Phase 2+ transactional-AI optionality (pre-COD)Galaxy for sovereign batch and civil inference economics; IBM Z where the buyer already trusts a mainframe hall and cannot move the ledger. Quote-only leasing, rent, buy, or colocation under T&Cs — campus or client-site. IBM remains a silicon evaluation option — not an endorsing partner.VERIFIED

Interested in Leasing?

Lease or finance IBM z17 / LinuxONE 5 units on AGICY premises, or at your site if it meets our T&Cs. Free estimate for integration and delivery (quote-only). Pre-COD; Leasing ≠ SRA / CY tokens.

Interested in Leasing?Contact hardware teamTenstorrent GalaxyResearch article
Tenstorrent GalaxyCerebras CS-3AMD Heliosd-Matrix CorsairTechnology stackCopperway gateway

§ FIN — Close of Document

Ready to build on sovereign infrastructure?

Schedule a confidential briefing with our team. NDA-protected, no commitment.

Schedule a briefing →
EU JURISDICTION · CYPRUSGDPR ART. 28 DPA-READY · BY DESIGNNIS2-ALIGNED · BY DESIGNEU AI ACT ART. 12 LOGGING SUPPORT · BY DESIGNRISC-V NATIVE · OPEN ISA

Design-alignment statements for a pre-construction facility — not certifications or attestations. Basis: compliance FAQ, § 08. Careers: we aim for 50-50 gender balance across hiring cohorts.

AGICY.AI

Advanced Governance & Intelligence Cyprus

The sovereign architecture for the Cyprus mind.
Humanitarian mandate: civilian public benefit only — healthcare, education, civil resilience. Civilian / humanitarian mandate only.
Office: 8 John Kennedy Street, Iris House, 7th floor, 3106 Limassol, Cyprus
+357 95 572 777 · 08:30 – 19:00 · agi@agicy.ai
VASILIKOS ENERGY CENTRE, LIMASSOL DISTRICT · PRE-CONSTRUCTION
34.7246°N · 33.2247°E
Principal campus: Cyprus Vasilikos (Phase 1). Parallel HoldCo path: sovereign compute project in Greece (TARGET / planning) — ~20 MW-class Tenstorrent / air-cooled inference positioning for EU diversification; separate CapEx, no offtake claimed.

The Ledger — monthly briefing
  • CopperwayEU-sovereign OpenAI-compatible gateway
  • Try PlaygroundNewLive Copperway demo · PII vault
  • Compression & PII vaultNewSovereign path controls in Playground
  • Sovereign Exchange5-year cross-org sovereign plan
  • ComputeBare-metal EU inference & training
  • UPDATED on GitHubAGICY AI desktop beta · source
  • Reserve CapacityPre-construction LOI tiers
  • MarketplaceCompute marketplace
  • AI Video SearchNewFind AI videos · avatars · films · ads
  • Sui Agent RailsPrivacy · Walrus · wallet connect
  • GPUs Rent LiveLiveEU partner GPU now · until COD
  • Compute VouchersSovereign compute credits
  • Model LeaderboardFrontier model rankings
  • PricingSubscription tiers
  • Research HubWave-1 publications index
  • Data CentersWorldwide map & tracker
  • Vasilikos Campus42MW sovereign campus briefing
  • Copperway vs gatewaysConcessive pricing & capability evidence
  • OpenRouter alternativesLiteLLM · Portkey · Copperway
  • EU alternative to OpenRouterCLOUD Act / sovereignty buyer guide
  • Copperway vs LLM gatewaysCapability evidence & SRA economics
  • GDPR-compliant AI hostingEU residency & processing path
  • Cerebras vs GroqInference speed & sovereign options
  • CLOUD Act riskUS parented API exposure
  • AI Act Digital OmnibusArticle 50 transparency duties
  • Sovereign cloud truthLabel vs residency — buyer checklist
  • EU AI ActRegulatory mapping & controls
  • AboutProject identity & status
  • GitHubAGICY AI public source · AGiOS-Ai-EU
  • MissionCharter & sovereignty
  • CareersCulture, benefits & hiring ethos
  • Open PositionsEngineering, research & operations roles
  • Ethics & CharterAnti-misconduct & responsible AI
  • Editorial & MethodologySources, claims, corrections
  • Trust CenterSecurity portal · docs · status
  • InvestInstitutional data room & deal flow
  • Living in EUIndividuals & FOs · Class B allocation
  • International investorsPlan B · Greece / Cyprus rails · Class B
  • Equity participation (legacy)CY & GR individual interest · counsel-gated
  • AcademyAI training programs
  • ContactBriefings & inquiries
  • Privacy PolicyGDPR · data processing
  • Terms of ServicePlatform usage terms
  • Cookie PolicyTracking & consent
  • SRA TermsReserve capacity agreement
  • Gateway Pricing DisclaimerCopperway pricing basis
© 2026 AGICY· PROJECT / BRAND OPERATOR · AGICY HOLDINGS LTD — NAME REGISTRATION APPLICATION COMPLETED · AWAITING APPROVAL · CORP DOCS TO FOLLOWDOC: AGICY.AI · REV 2.0 · SOVEREIGN LEDGER
AGICY